ESCALATORS

We offer complete services for escalators and moving walkways in shopping centers, airports, metro stations and other public spaces.

  • New escalator installation
  • Moving walkway installation
  • Preventive maintenance
  • Emergency repairs
  • Existing system modernization
  • Technical consulting

ROMANIA

Modatim Commercial Complex

Modatim Commercial Complex

“Titu Maiorescu” University is a private higher education institution in Bucharest, established on September 20, 1990.Our company installed one elevator with a capacity of 1000 kg, serving 5 stops, and with a speed of 1 m/s.
“Titu Maiorescu” University

“Titu Maiorescu” University

“Titu Maiorescu” University is a private higher education institution in Bucharest, established on September 20, 1990.Our company installed one elevator with a capacity of 1000 kg, serving 5 stops, and with a speed of 1 m/s.
Dedeman

Dedeman

The Dedeman retail chain has been present on the market since 1992, catering to those looking to furnish and renovate their homes. With a surface area of over 5,000 sqm, the store offers a wide range of products including sanitary ware, electrical items, construction materials, interior design materials, garden supplies, and more.As part of this project, 3 elevators were installed, each with a capacity of 1800 kg, 2 stops, and a speed of 0.5 m/s.
Hermes

Hermes

Hermes Business Campus is an office complex managed by the real estate consulting company Colliers International. The complex is located on Dimitrie Pompeiu Boulevard and covers a built area of 78,000 sqm, including an underground parking facility.In 2016, 4 elevators were installed within the complex, with the following technical specifications:2 elevators with a capacity of 2000 kg, 5 stops, and a speed of 2 m/s2 elevators with a capacity of 2000 kg, 9 stops, and a speed of 2.5 m/s
Biscuit Factory

Biscuit Factory

SC ETI EUROPEAN FOOD INDUSTRIES SA is a biscuit factory located in the Craiova Industrial Park, spanning 8 hectares.Our company installed elevators with a capacity of 5 tons, 3 stops, and a speed of 0.5 m/s.
Maritimo Complex

Maritimo Complex

Maritimo is a shopping center in Constanța, owned by the Austrian group Immofinanz. It was opened in the autumn of 2011 and covers an area of 50,000 square meters.Our company installed 3 elevators, each with a capacity of 1000 kg, 2 stops, and a speed of 0.5 m/s.
Mega Image

Mega Image

Mega Image is one of the first and largest supermarket chains in Romania, founded in 1995. Inside this supermarket, we installed one lift with a capacity of 2500 kg, 2 stops, and a speed of 1 m/s.
Stadium Târgu Jiu,

Stadium Târgu Jiu,

Originally built between the 1960s and 1970s, the Târgu Jiu Stadium has a capacity of 12,500 seats. The stadium can be used for both national and international sports competitions.As part of this project, a lift with a capacity of 630 kg, 4 stops, and a speed of 1.0 m/s was installed.
Bridge over the Danube

Bridge over the Danube

The Brăila Bridge over the Danube is an impressive construction, representing the longest suspension bridge in Romania and one of the largest in Europe. Inaugurated in 2023, this bridge has quickly become a symbol of Romanian infrastructure modernization and an important connection between the historical regions of Muntenia, Western Moldova, and Northern Dobrogea.The suspension bridge has a total length of 1,974.30 m, a central span of 1,120 meters, and two side spans of 489.65 and 364.65 meters.Our company installed 4 inclined rack-and-pinion elevators inside the bridge pylons, with capacities of 1000 and 2000 kg.
United Business Center 0

United Business Center 0

The United Business Center 0 office building, part of the Iulius Town mixed-use complex, represents the new generation of premium office buildings in Timișoara. It combines contemporary architectural elements with state-of-the-art technical features that greatly enhance employee comfort and promote responsible resource consumption. Our team installed 12 elevators with capacities ranging from 1000 to 1200 kg, and speeds of up to 6 m/s.
Palas Campus

Palas Campus

Palas Campus Iași is the largest office building in Romania and also the most significant investment made in Iași in the last 10 years. The offices in Palas Campus integrate all the latest features of premium office spaces: generous areas, premium finishes, extended natural light during the day, common areas for relaxation and socializing that foster creativity and efficiency, secured parking spaces, and plenty of greenery. On the ground floor, employees in the building have access to a wide range of facilities, from concept restaurants and cafés for lunch breaks, to a supermarket and various services, as well as a fitness center, a physiotherapy clinic, and other medical services. Binape installed 24 elevators with a capacity of 1800 and 2000 kg, and a speed of 1.6 m/s.
Fabrica Continental

Fabrica Continental

Continental continues to develop projects in Timișoara that drive the future forward. Electrification, connectivity, and autonomous driving are megatrends that the team at this location actively contributes to, both in the engineering center and in the electronic components factory. Groundbreaking solutions, technologies, and high-quality products are designed, created, developed, tested, and manufactured in Timișoara. All these solutions are intended for a wide range of vehicles: from sports cars to trucks or modern tractors that work the fields with centimeter-level precision. Within the factory, the Binape team dismantled and installed 2 special elevators with a capacity of 11 tons.
Henri Coandă Airport Bucharest

Henri Coandă Airport Bucharest

In this project, Binape installed all the escalators.
Brașov International Airport

Brașov International Airport

In this project, Binape installed all the escalators.
Iași International Airport

Iași International Airport

In this project, Binape installed all the escalators.
Unique Building

Unique Building

Unique Building Iasi is an office building with 6 levels of underground parking, 110 parking spaces, 9 floors and over 4300 sqm of leasable area. Within the project were installed 29 parking elevators with a lifting capacity of the platform of 2500 kg. These parking devices allow the intelligent storage of 2 cars in a single parking space, thus doubling the parking facilities at no construction cost.

DENMARK

The Silo

The Silo

Located near the Nordhavnen district, The Silo is one of the industrial buildings transformed at the end of 2016 into a private residential and public institution complex. As part of this project, elevators with a capacity of 1150 kg, 14 stops/25 doors, speed 2.00 m/s were installed, as well as elevators with 13 stops/24 doors, speed 2.00 m/s.
Carlsberg Byen

Carlsberg Byen

Located in the heart of the city, the new residential tower is part of the UCC University College complex. Positioned in the southeast area and covering 10,000 m², the residential complex is built as part of the UCC University College campus. The entire campus blends educational and commercial centers to create a vibrant and multifunctional urban area. As part of this project, elevators with a capacity of 1000 kg, 24 stops, and a speed of 4.00 m/s were installed.
Herlev Hospital

Herlev Hospital

Located near Copenhagen, in the Herlev region, as its name suggests, the university hospital is the seventh tallest hospital in the world and the tallest building in Denmark. Its construction began in 1965 and was completed in 1975. As part of the Herlev Hospital project, 16 elevators were installed. The experience accumulated over the years allows our installers to handle daily challenges and adapt to the working environment.
Aalborg Hospital

Aalborg Hospital

Located in the Northern region, Aalborg Hospital is the largest medical center in Denmark and plays a key role in the sustainability of the Danish healthcare system. As part of the Aalborg Hospital project, 8 elevators with a capacity of 2000 kg, 12 stops, and a speed of 2.00 m/s were installed, with both installation and dismantling operations carried out.
Blox

Blox

The Blox complex offers new opportunities for hosting major events and unique facilities for running educational programs for students and children related to learning environments. As part of this project, elevators with a capacity of 5000 kg, 5 stops, and a speed of 1.00 m/s were installed.
Ceres Panorama

Ceres Panorama

Ceres Panorama is one of the largest buildings in Aarhus, Denmark. With a grand appearance, Ceres Panorama is a residential building with 130 private properties. As part of this project, 4 elevators were installed as follows:1 elevator with a capacity of 1150 kg, 21 stops, speed 1.75 m/s;1 elevator with a capacity of 1000 kg, 21 stops, speed 1.75 m/s;2 elevators with a capacity of 1000 kg, 4 stops, speed 1.00 m/s.
Copenhagen Metro

Copenhagen Metro

The Copenhagen Metro is a rapid transit system in Copenhagen, Denmark, serving the municipalities of Copenhagen, Frederiksberg, and Tårnby. As part of this project, 44 panoramic elevators were installed.
Copenhagen Towers

Copenhagen Towers

The four buildings of Copenhagen Towers are best known for the 21-story “North Tower,” designed by Foster and Partners, and the hotel building. Not only does it host several international companies and organizations, but it also serves as the setting for the Crowne Plaza Hotel. Our company installed 5 elevators with a capacity of 1275 kg and one elevator with a capacity of 2250 kg, with a speed of 5 m/s.
New Aalborg University Hospital (NAU)

New Aalborg University Hospital (NAU)

NAU is a new hospital complex in East Aalborg that serves the entire North Jutland region. The project also includes 25,000 m² for the Faculty of Health Sciences (SUND) of Aalborg University and the development of a master structural plan covering a total area of approximately 330,000 m². This includes the creation of Aalborg Psychiatric Hospital, an oncology house, a patient hotel, the expansion of the outpatient clinic, a service village, and a chapel. A total of 59 elevators were installed, with capacities ranging from 825 to 4000 kg.

GREAT BRITAIN

Royal Liverpool University Hospital (RLUH)

Royal Liverpool University Hospital (RLUH)

Located in the city of Liverpool, United Kingdom, the Royal Liverpool University Hospital is the largest university hospital in the Merseyside and Cheshire district and houses the largest emergency department in the UK.As part of this major project, the installation of elevators with capacities of 2550 kg and a speed of 1.6 m/s predominated, with the number of stops varying between 8, 11, and 12.
Westgate Shopping Centre

Westgate Shopping Centre

Elegant and spacious, the Westgate Shopping Centre reimagines the city of Oxford as a premier retail and lifestyle destination.The commercial complex spans approximately 800,000 m² and features unique restaurants and cafés, a boutique cinema, and stylish rooftop bars.As part of this project, 24 elevators were installed with capacities ranging from 1000 to 2500 kg, and speeds of 1.0 m/s and 1.6 m/s.
Royal Liverpool University Hospital Extension

Royal Liverpool University Hospital Extension

The Royal Liverpool University Hospital is one of the largest medical centers in Merseyside. This project is among the most significant developments carried out in the UK. As part of this work, 13 elevators were installed, with capacities ranging from 2250 kg to 4000 kg.
Ikea

Ikea

Founded in Sweden, IKEA is a company that sells home furniture. The company is owned by a Dutch foundation and managed by the Kamprad family.Opened in July 2017, the IKEA complex is located on Sheffield Road, Tinsley, and offers a wide range of high-quality, well-designed, and affordable products for everyone.IKEA Sheffield was a large-scale project in which 12 elevators were installed, ranging from 1600 to 5000 kg, with a speed of 1.0 m/s, predominantly freight elevators.
Primark Westgate

Primark Westgate

Located in the heart of Oxford, Primark Westgate Oxford is known for its style, quality, and affordability. This new destination stands out through its variety of styles, both for home and fashion.The Westgate project included the installation of 4 elevators with a capacity of 2000 kg, 3 stops, and a speed of 1.0 m/s.
Liverpool FC Stadium Expansion

Liverpool FC Stadium Expansion

The FC Stadium Expansion project was another development carried out in England. Located in Anfield, Liverpool, it is the sixth-largest stadium in England.As part of this project, 6 elevators were installed, 3 of which feature VIP cabins, with capacities of 1600 kg, ranging from 2 to 7 stops, and speeds of 1.00 m/s and 2.00 m/s.
Victoria Square

Victoria Square

Victoria Square is a residential skyscraper complex and part of a wider redevelopment project of Woking town centre in Surrey, England. The two tallest towers, Tower 1 and Tower 2, are residential buildings with 34 and 32 floors respectively, rising to heights of 117 m and 105 m. The third building, Tower 3, houses a Hilton hotel with 23 floors and a height of 94 m.Our company installed 17 elevators with capacities ranging from 1000 to 2000 kg and a speed of 2.5 m/s.
Crown Street

Crown Street

A residential development with two towers and a podium in Manchester, offering 664 units, leisure spaces, amenities, community gardens, and commercial space. This development consists of two buildings — Victoria Residence with 21 floors and Elizabeth Tower with 51 floors — set atop a shared podium. Together, they provide 664 residential units. The residents' pool, gym, and communal garden are located on the 44th floor of Elizabeth Tower, while Victoria Residence also features a communal garden on the 16th floor.As part of the project, 8 elevators were installed with capacities ranging from 1000 to 2000 kg and a speed of 6 m/s.

SWEDEN

Gothia Towers

Gothia Towers

Gothia Towers was the most significant project carried out in Sweden, being the largest hotel in the Nordic countries. Gothia Towers is part of the Swedish Exhibition & Congress Centre. The building includes public halls, accommodation facilities, and office spaces.As part of this project, 12 elevators were installed, including 2 panoramic elevators with a capacity of 1250 kg, 22 stops, and a speed of 3.50 m/s.
Helsingborg

Helsingborg

As part of the Helsingborg project, 2 elevators were installed with capacities of 7000 kg, 2 stops / 3 doors, and a speed of 0.50 m/s.
Life City

Life City

Life City is the new meeting place in Stockholm for everyone looking to shape the future. In the heart of the new Hagastaden district, innovative ideas have room to grow. State-of-the-art conference and office spaces, sustainability-focused restaurants, and a vibrant flow of people contribute to the building's unique atmosphere. Conference rooms with high ceilings and space for new ideas!Life City hosts several well-equipped conference and meeting rooms for 16–250 people, along with all the services needed for an efficient and fulfilling event.Our colleagues installed 8 elevators with capacities ranging from 1000 to 2000 kg, at a speed of 1.6 m/s.
Karlatornet

Karlatornet

Karlatornet is an iconic project aiming to revolutionize skyscraper construction in Scandinavia. As the tallest building in Gothenburg and the Nordic countries, with an impressive height of 247 meters and 74 floors, Karlatornet sets new standards for architectural innovation and urban development in the new Karlastaden district.This mixed-use tower includes 611 apartments, a hotel, offices, and a sky bar, offering a vibrant and modern living and working environment.Five elevators of 1600 kg capacity were installed, with speeds of 6 and 8 m/s.
Nya Kronan

Nya Kronan

Nya Kronan in central Sundbyberg has been transformed into a modern, eco-friendly office district with flexible and sustainable workplaces. A total of 40,000 square meters of new office and parking space has been created. The building features solar cells integrated into part of the façade and solar panels on the rooftops. There are large bicycle parking areas with an associated service zone and changing rooms.Nya Kronan was designed to achieve LEED Platinum Core & Shell environmental certification, which is the highest level.As part of this project, our company installed 10 panoramic elevators with speeds of up to 2 m/s.
Platinan

Platinan

Platinan is located right in the heart of Gothenburg. With a surface area of 60,000 square meters, the building has become a new landmark featuring offices, a hotel, and meeting spaces. With its unique architecture, Platinan stands out in many ways—from its size and construction to its focus on sustainability and bright environments. The large glass façades reflect the surrounding city and create dynamic interior spaces. An intelligent control system measures the amount of natural light, so electric lighting is adjusted to complement it.A total of 22 elevators were installed, with capacities ranging from 630 to 2000 kg and speeds of up to 2.5 m/s.

IRELAND

Gothia Towers

Gothia Towers

Gothia Towers was the most significant project carried out in Sweden, being the largest hotel in the Nordic countries. Gothia Towers is part of the Swedish Exhibition & Congress Centre. The building includes public halls, accommodation facilities, and office spaces.As part of this project, 12 elevators were installed, including 2 panoramic elevators with a capacity of 1250 kg, 22 stops, and a speed of 3.50 m/s.
Helsingborg

Helsingborg

As part of the Helsingborg project, 2 elevators were installed with capacities of 7000 kg, 2 stops / 3 doors, and a speed of 0.50 m/s.
Life City

Life City

Life City is the new meeting place in Stockholm for everyone looking to shape the future. In the heart of the new Hagastaden district, innovative ideas have room to grow. State-of-the-art conference and office spaces, sustainability-focused restaurants, and a vibrant flow of people contribute to the building's unique atmosphere. Conference rooms with high ceilings and space for new ideas!Life City hosts several well-equipped conference and meeting rooms for 16–250 people, along with all the services needed for an efficient and fulfilling event.Our colleagues installed 8 elevators with capacities ranging from 1000 to 2000 kg, at a speed of 1.6 m/s.
Karlatornet

Karlatornet

Karlatornet is an iconic project aiming to revolutionize skyscraper construction in Scandinavia. As the tallest building in Gothenburg and the Nordic countries, with an impressive height of 247 meters and 74 floors, Karlatornet sets new standards for architectural innovation and urban development in the new Karlastaden district.This mixed-use tower includes 611 apartments, a hotel, offices, and a sky bar, offering a vibrant and modern living and working environment.Five elevators of 1600 kg capacity were installed, with speeds of 6 and 8 m/s.
Nya Kronan

Nya Kronan

Nya Kronan in central Sundbyberg has been transformed into a modern, eco-friendly office district with flexible and sustainable workplaces. A total of 40,000 square meters of new office and parking space has been created. The building features solar cells integrated into part of the façade and solar panels on the rooftops. There are large bicycle parking areas with an associated service zone and changing rooms.Nya Kronan was designed to achieve LEED Platinum Core & Shell environmental certification, which is the highest level.As part of this project, our company installed 10 panoramic elevators with speeds of up to 2 m/s.
Platinan

Platinan

Platinan is located right in the heart of Gothenburg. With a surface area of 60,000 square meters, the building has become a new landmark featuring offices, a hotel, and meeting spaces. With its unique architecture, Platinan stands out in many ways—from its size and construction to its focus on sustainability and bright environments. The large glass façades reflect the surrounding city and create dynamic interior spaces. An intelligent control system measures the amount of natural light, so electric lighting is adjusted to complement it.A total of 22 elevators were installed, with capacities ranging from 630 to 2000 kg and speeds of up to 2.5 m/s.

NORTHERN IRELAND

Hotel Maldron

Hotel Maldron

Hotelul Maldron a fost inițial o clădire ce cuprindea 206 camere, însă, între timp arhitectul complexului a depus o cerere pentru a crește numărul camerelor la 237 fără o creștere substanțială a bugetului. Aerul contemporan al complexului se îmbină cu finisajele moderne rezultând o lucrare de o calitate impecabilă.În cadrul proiectului Maldron, au fost montate 4 lifturi, cu greutati situată între 800 și 1000 kg, 13 stații, viteza cuprinsă între 1,60 și 2,00 m/s cu opțiuni speciale precum KDM 40 Slim.
Allstate

Allstate

Allstate este cea mai mare companie de IT din Irlanda de Nord, fiind un centru major pentru dezvoltarea de software inovatoare, care acoperă întregul ciclu de viață al software-ului de proiectare, dezvoltare, întreținere și suport.Allstate joacă un rol strategic în dezvoltarea, transformarea și menținerea diferitelor platforme tehnologice utilizate în cadrul acestui complex, în vederea susținerii afacerilor de zi cu zi. AllState se axează pe furnizarea serviciilor de calitate pentru clienți și are o experiență bogată în ceea ce privește serviciul de livrare și serviciile IT.În cadrul acestui proiect, au fost montate un număr de 3 lifturi cu greutate 1150 kg, viteză 1,75m/s cu opțiuni speciale precum KDM 40 SLIM.
College Avenue

College Avenue

Complexul College Avenue poate fi un considerat un mic orășel datorită facilităților pe care le oferă precum: parcare, curți amenajate, cazare și spații comerciale.Proiectul College Avenue cuprinde montajul a 4 lifturi cu greutati de 630 kg, 11-12 stații, viteza cuprinsă între 1,00 m/s și 1,60 m/s cu opțiuni speciale precum lanț de echilibrare.
Bellfast City Quays 2

Bellfast City Quays 2

City Quays 2 este o clădire de birouri de nouă etaje, ce oferă oportunități și spațiu angajaților la locul de muncă. Acesta dispune de o cafenea și de o parcare auto.Acest proiect cuprinde 2 lifturi cu greutatea cuprinsă între 1600-2000kg, viteză 2,00m/s, 9 stații 18 uși cu opțiuni speciale precum KDM 40 și 90.

FRANCE

The Atrium

The Atrium

The Atrium is a complex of 4 buildings located 15 minutes from the center of Paris, offering 15,000 sqm of office space spread over 7 levels plus a ground floor. As part of this project, 7 elevators with a capacity of 800 kg and 7 stops were installed.
Orange Villejuif

Orange Villejuif

Orange Villejuif is the second largest Orange center, with 1,100 employees. The building includes 18,000 sqm of office space distributed over 7 levels. This project involved the installation of 2 elevators with a capacity of 800 kg, serving 7 stops.
Sanzillon-Clichy

Sanzillon-Clichy

Sanzillon Clichy is a new building complex with 7 to 10 floors, offering modern apartments ranging from 2 to 5 rooms. As part of this project, 3 elevators were installed with capacities between 800 and 1000 kg, serving 8 or 10 stops.
Grand Paris Express Metro

Grand Paris Express Metro

The Grand Paris Express is a project that consists of new rapid transit lines and the extension of existing ones currently under construction in the Île-de-France region of France. The project includes four new metro lines for the Paris network, along with extensions of lines 11 and 14. A total of 200 kilometers of new tracks and 68 new stations will be added, serving approximately 2 million passengers per day. The Binape team installed 86 escalators.
RATP Paris Metro

RATP Paris Metro

The Paris Metro is one of the public transportation systems serving the city of Paris and its metropolitan area. Operated by Régie Autonome des Transports Parisiens (RATP), it has sixteen metro lines, totaling 245.6 kilometers and 321 stations. It has become one of the symbols of Paris, known for the density of its network in the heart of the city and its uniform architectural style influenced by Art Nouveau. The Paris Metro is one of the densest in the world. Binape technicians installed 10 escalators.

SERBIA

Galeria Belgrad (Belgrade Waterfront)

Galeria Belgrad (Belgrade Waterfront)

Galeria Belgrad is a luxury complex featuring residential buildings, offices, shops, and a 200-meter tower, all located on the banks of the Sava River in Belgrade. As part of this project, escalators were installed (type, minimum technical specifications, etc.).
BEO Shopping Center

BEO Shopping Center

BEO Shopping Center is a commercial complex located in Belgrade, with a total area of over 130,000 square meters, offering spaces for shops, a cinema, a supermarket, children's play areas, and restaurants.As part of this project, escalators were installed (type, minimum technical specifications, etc.).
Aviv Park Zvezdara Shopping Center

Aviv Park Zvezdara Shopping Center

Aviv Park Zvezdara Shopping Center is located in the heart of Zvezdara city. It spans five levels and hosts one of the largest hypermarkets, covering an area of 2,500 square meters. During winter, Aviv Park Zvezdara opens an ice-skating rink for visitors. The shopping center offers a wide range of services, from currency exchange offices, optical shops, fashion stores, children's equipment, bookstores, electronics and home appliances stores, telecommunications shops to restaurants, cafés, and beauty salons. Binape technicians installed 24 escalators.

GERMANY

BMW Group Plant 2.20

BMW Group Plant 2.20

Since the first production lines were launched 10 years ago, the BMW Group Plant 2.20 in Dingolfing has built over 1.5 million electric motors, one million high-voltage batteries, and 10 million battery modules. The site in Lower Bavaria continues to be a pioneer in accelerating electric mobility. At this plant, Binape installed 3 hydraulic lifts, including 1 duplex lift with a capacity of 10 tons and 2 lifts with a capacity of 8 tons.

MARINE DIVISION

HANSEATIC Spirit, Passenger Ship

HANSEATIC Spirit, Passenger Ship

In August 2021, one of the newest ships in the Hapag Lloyd Cruises fleet was completed and named HANSEATIC. The expedition vessel can travel to many destinations where larger cruise ships must turn back, allowing guests to experience breathtaking natural landscapes up close. Authentic expedition experiences leave nothing to be desired on this luxury line, giving passengers the chance to fully enjoy their surroundings. There is room for 230 passengers on board the HANSEATIC, and up to 199 guests can participate in expeditions to the Arctic and Antarctic, ensuring a personal atmosphere. Five special lifts were installed, with capacities between 1000 and 1250 kg and a speed of 1.6 m/s.
Utopia of the Seas, Cruise Ship

Utopia of the Seas, Cruise Ship

Utopia of the Seas is a cruise ship operated by Royal Caribbean International. It is the sixth ship in the Oasis class and entered service on July 19, 2024, from Port Canaveral. It measures 362 meters in length, 64 meters in width, with a total of 18 decks accessible to guests and a capacity of 5,688 passengers. Utopia of the Seas offers a wide variety of accommodation options on board, from budget-friendly interior cabins to the ship’s massive (and imaginative) suites, including the Royal Loft Suite and the whimsical Ultimate Family Suite, which features a staircase that plays musical notes as guests walk on it. The commissioning of 43 lifts with capacities of up to 1800 kg was carried out by Binape technicians.
MSC World America, Cruise Ship

MSC World America, Cruise Ship

Launched in 2025, MSC World America is one of the newest ships in the MSC fleet, promising an innovative and captivating cruise experience by combining cutting-edge technology with luxurious comfort. This ship stands out through its futuristic design and a wide range of facilities, perfectly suited to meet the needs of all passengers—from families with children to travelers seeking relaxation and luxury. The vessel has a capacity ranging from 5,240 to 6,314 passengers, measures 333 meters in length and 41 meters in width. With a variety of activities, restaurants, bars, and relaxation areas, MSC World America is set to be a destination in itself, offering everything needed for an unforgettable holiday at sea. Binape technicians carried out the commissioning of 42 lifts with a capacity of up to 3 tons and a speed of 1.6 m/s.
ILMA Superyacht

ILMA Superyacht

Ilma pays tribute to the sea – the scenic route that leads you to the world’s iconic yachting destinations. Its spacious suites with private terraces, open-air lounges, and a marina at the aft right on the water are all designed to connect you with the seascapes you sail through and the coastal ports you explore. With the highest space-to-guest ratio at sea, Ilma features 224 suites – all with private terraces – and introduces two new superior suite categories with over 1,000 square meters of space. Binape technicians commissioned 12 lifts with a speed of 1.6 m/s.