GERMANY

BMW Group Plant 2.20

BMW Group Plant 2.20

Since the first production lines were launched 10 years ago, the BMW Group Plant 2.20 in Dingolfing has built over 1.5 million electric motors, one million high-voltage batteries, and 10 million battery modules. The site in Lower Bavaria continues to be a pioneer in accelerating electric mobility. At this plant, Binape installed 3 hydraulic lifts, including 1 duplex lift with a capacity of 10 tons and 2 lifts with a capacity of 8 tons.